 GERALD WORKS ON FIRE VAULT 6/9/03 |
 1ST LOAD OF FRAMING LUMBER 6/11/03
|  NEIL(WITH SOME HELP) & GERALD MOVE LUMBER 6/12/03 |
 BRIAN, GERALD, ZUCCA, MICHAL & BRAD - 1ST WALL 6/12/03
|  PETE, CARL & GERALD SET BEAM. NEIL??? 6/13/01
|  BEAM NOW SET. CARL & GERALD MOVE FRAMING LUMBER 6/13/03
|
 BRAD & BRIAN BUILD MICHAL INSPECTS 6/17/03
|  BRIAN CHECKS THE TOP 6/17/03
|  GERALD CHECKS BEAM PLACEMENT 6/17/03
|
 BRAD & GERALD POUR FIRE VAULT TOP. NEIL WATCHES TRUCK 6/17/03
|  BRAD & BRIAN PLACE JOISTS 6/18/03
| 
BRIAN & BRAD SET FLOOR JOISTS 6/18/03
|
 BRIAN & BRAD FINISH FLOOR JOISTS & SUB- FLOOR
6/20/03
|  LOWER SHEATHING & MAIN SUB-FLOOR COMPLETE!!! 6/20/03
|  1st PLUMBING, BY GREG (LOWER BATH & PUMP PIT) 6/25/03
|
 BRAD, BOB, GLENN, BRIAN & GERALD - 1st DECK 6/27/03
|  FINAL DECK WORK 7/1/03 |
 BRIAN AT LOOKOUT BRAD DRIVES WITH LUMBER FOR WALLS 7/1/03
|
 1st UPPER WALL SECTION COMPLETE & MOVED TO TEMP. STORAGE 7/2/03
|  TYE, SHAAR & FAMILIES UP FOR 4th JULY INSPECTION 7/5/03
|  MICHAL, ZUCCA & NEIL INSPECT 7/6/03
|
 BRIAN & BRAD 1st MAIN WALL UP 7/7/03
|  ALL OCTAGON WALLS UP 7/7/03
|  MORE WALLS UP 7/14/03
|
 BRAD & BRIAN BUILD INTERIOR WALLS 7/15/03
|