BOTTING NET  


HOME CONSTRUCTION SERIES 12/30/03 THRU - 1/30/04


INTERIOR STAIRS
GERALD, DARREL, SLIM,
GREG & TY MOVE INTERIOR
STAIRS INSIDE. ZUCCA
BEAR & NEIL HELP? 12/30/03
STAIRS
STAIRS EASED INTO
PLACE 12/30/03
neil on stairs
GERALD & SLIM WATCH
NEIL TEST STAIRS
12/30/03
COFFEE
ENJOYING MICHAL'S FRESH
COFFEE & MUFFINS AFTER
STAIR PLACEMENT 12/30/03
DAN LOW VOLTAGE
DAN SORTS SOUND
SYSTEM WIRES 12/30/03
DAN
DAN MAKES 1st SPEAKER
CUT-OUT 12/30/03
SCOTT & DAVE-WATER SYSTEM
SCOTT & DAVE WORK
ON WATER SYSTEM 12/31/03
STEVEN-GARAGE DOORS
STEVEN INSTALLS
GARAGE DOORS 1/2/04
FLORISSANT VALLEY
EARLY MORNING VIEW OF
FLORISSANT VALLEY 1/4/04
WATER SYSTEM
SCOTT, MARK & RUSS
WORK ON WATER SYSTEM
1/6/04
GERALD-FLOOR PREP
GERALD PREPS FLOOR
FOR TILE & OAK FLOORING
1/6/04
MARK & RED-WATER
MARK & RED SET TO
FILL CISTERNS 1/6/04
DON & GERALD-CABINETS
DON & GERALD BRING
IN FIRST CABINETS
1/6/04
MICHAL
MICHAL INSPECTS KITCHEN
CABINETS 1/6/04
DON-CABINETS
DON INSTALLS KITCHEN
CABINETS 1/7/04
MIKE & RALPH-HARDWOOD FLOOR
MIKE & RALPH START
GREAT ROOM FLOORING
1/8/04
HOWARD-FLOOR
HOWARD WORKS ON
NEIL'S OFFICE FLOOR
1/8/04
MICHAEL & MARK-MBR
MICHAEL & MARK FLOOR
MASTER BEDROOM 1/8/04
LAURA-FLOOR
LAURA FLOORS
MICHAL'S OFFICE
1/8/04
KEITH-STAIR
KEITH WORKS ON
STAIR BULLNOSE
1/8/04
NEIL-FLOORING
NEIL NAILS OAK
1/9/04
BURT-TILE
BURT STARTS TILE
UNDERLAYMENT 1/12/04
MICHAL
MICHAL LABELS HEAT
SYSTEM PIPES 1/13/04
OCTAGON FLOOR
LAST PIECE OCTAGON
FLOOR INSTALLED 1/13/04
FRONT DOOR
LAURA, RALPH, GERALD &
NEIL PREPARE TO INSTALL
FRONT DOOR 1/13/04
GERALD & BILL
GERALD & BILL CHECK
DOORS & TRIM 1/13/04
BURT-TILE
BURT PLACES 1ST
FLOOR TILES 1/13/04
BURT-SHOWER BASE
BURT BUILDS SHOWER
BASE 1/15/04
GERALD-TEMP TREADS
GERALD INSTALLS TEMP
STAIR TREADS 1/15/04
GREG-WIRING
GREG HELPS WITH HEAT
CONTROL WIRING 1/15/04
BURT-TILE
BURT SETS TILE IN
GUEST BATH 1/20/04
WHAT'S MISSING?
PORTAPOTTY GONE
PORT-A-POTTY GONE! HERE
4/22/03 THRU 1/15/04 (PHOTO
1/21/04 AFTER 6" SNOW)
DAN-LOW VOLTAGE
DAN STARTS WORK ON
LOW VOLTAGE PANEL
1/21/04
GERALD-STAIRWELL
GERALD FINISHES STAIR-
WELL IN OAK 1/22/04
RUSS-ELECT. TRIM
RUSS TRIMS ELECTRICAL
IN MICHAL'S OFFICE. PIKES
PEAK THRU WINDOW
1/23/04
GERALD-DOORS
GERALD HANGS DOORS
1/23/04
TUB SURROUND
BURT TILES TUB SURROUND
THAT GERALD BUILT.
GERALD SUPERVISES 1/27/04
RUSS
RUSS HANGS FOYER
LIGHT 1/27/04
MICHAL-ENTRY SLATE
MICHAL WORKS ON FOYER
SLATE DESIGN 1/28/04
DAWN & JEANNINE-GRANITE MEASURE
DAWN & JEANNINE TAKE
FINAL GRANITE
MEASUREMENTS 1/29/04
BURT-FOYER
BURT SETS SLATE IN
FOYER 1/29/04
GREG-TUB
GREG WORKS ON TUB
1/29/04
BURT-HEARTH
BURT PLACES TILE FOR
HEARTH 1/29/04
BURT & GREG-VANITY
BURT HELPS GREG WITH
VANITY FAUCETS
1/30/04